The List Of Projects Undertaken By B.E. Students (2018-19)

  1. Design of sliders for plastic injection moulds and feaseability study of additive manufacturing for tool rooms
  2. Advancements in 3D Printing technology, Material testing, Flame Resistant Materials
  3. Productivity Improvement of Interchangeable systems of AF machines by standardization of processes and Ergonomic designing of workstations  
  4. Integration of 3D Printing in L&T's K9 Vajra & Planning and Execution of Joystick Assembly 
  5. Reduction of Inventory Costs by Salvaging Free Stock and Implementation of 5S and Continuous Improvement
  6. Assembly line balancing
  7. Plant layout for Coating Shop & Intricacies in Phosphate coating 
  8. Design of Test Rig for Hydraulic Naval Ship Stabiliser
  9. Fine Tuning of Planning Documents, Cost Reduction of Heat Exchangers
  10. Productivity Improvement through Design Improvements in Welding Positioner, Optimization of Preheating Methods for Welded Joints and Setting up Methodology of Tank Rotators
  11. Improvements in the procurement and storage of tooling materials for m/c shop and CNC department.
  12. Defect Analysis of HP Feed Water Heater using QC Tools & Implementation of Lean Manufacturing Techniques in the Insertion of Tube Bundle in Heat Exchangers
  13. Process development and Die designing for Sheet Metal components
  14. Lead time reduction in assembly of Encapsulation machines by introduction of Material replenishment systems
  15. EAM & LN Integration for spare part management and standardization of parts
  16. Implementation of QR code for tracking and improving material management on shop floor
  17. Reduction in cycle time of Nozzle Fabrication Process
  18. Standardization of Mould design and implementation of 5s
  19. Development of a Procedure to Check Tube to Tubesheet Joint Expansion and Automated Shell Marking System 
  20. Cost Reduction Through Optimization of Calibration Interval
  21. Design of lifting assembly for submerged arc welding (SAW) machine
  22. Migration from OHSAS 18001 to ISO 45001
  23. Evaluation and optimization of welding of PSLV middle segments and design of inventory tracking system
  24. PROCESS PLANNING OF AUTOMATIC FILLING SERIES MACHINE FOR COST OPTIMIZATION
  25. Design of Plate Alignment Fixture for Rolling Machine
  26. Reduction in Stock Variance by using Material Management Techniques
  27. Assisting and Catalyzing the Communications and Marketing Process
  28. Tube to tubesheet orbital welding of Titanium
  29. Design of Cost Effective Semi-electric Hand Pallet Trolley
  30. Implementation of LEAN Six Sigma on shop floor
  31. Optimisation of the machining Parameters and implementation of 5S
  32. Design of fixture for stiffness test of helical torsion spring
  33. Increasing the efficiency of conveyorized powder coating system by fixture modification &
  34. Harnessing the light energy emitted by LED light fittings during soaking process by using solar panels 
  35. Improvement in material feeding system by introducing kitting concept for assembly of AF90T machine
  36. Standardization of sliders and lifters in a mould and Implementation of 5s
  37. RE-DESIGNING AND DRAFTING OF NON-STANDARD TERMINAL BOX
  38. Improvement in Material Procurement and Stores Functioning 
  39. Successful execution of drilling & machining of titanium tubesheets
  40. spare optimization and design of fixture for helical torsion spring
  41. Fixture for measuring boundary conditions of MCCB(Frame 6)

 

The List Of Projects Undertaken By B.E. Students (2017-18)

  1. Design, Planning and Manufacturing of Elbow Mounting Fixture & Proposal for Procurement of Inclined Band saw and Design of its Clamping Fixture for Backing Ring
  2. Implementation of Minimum Order Quantity to Reduce the Lead time in supply value chain
  3. Optimization Of Truck Trailer Chassis Using Static Structural Analysis
  4. Applying Manufacturing Excellence At Vendors
  5. Optimisation of transport cost and maximization of GST benefits
  6. Thrust shaft axial movement correction in Thrust Bearing Assembly
  7. A Comprehensive study of design methodology of pressure vessel using ASME BPVC DIV 1 vis a vis CODAP DIV 1
  8. Business Transformation of the Centralized Spares Department
  9. Cycle Time Reduction of spot welding in 32PHB Basket
  10. Implementation of design for manufacturing for critical structural components employed in two wheeled robotic system
  11. Development of post processor for optimizing CNC machining processes and design of machining fixture of sub-antenna for SAC (ISRO)
  12. Streamlining supply chain for Linea with GST Migration
  13. Intricacies in Tube-to-Tubesheet welding
  14. Developing Tailor Made Solution for Improvising Scintilla Chair, Vendor Development for An Alternate Source for RM Nylon 6 & Supplier Evaluation Using BS Rating
  15. Development & Indigenisation of Running Gear for Military Vehicle
  16. Enhancement of Productivity for Karina Chair Upholstery using Vacuum Foam Moulding
  17. Creating logistics module
  18. Intricacies in heat treatment of steam drum
  19. Design of Process Planning for Enhancement of Efficiency in Assembly of Capsule Filling and Band Sealing Machines
  20. Inventory of standard parts with attributes acquisition and PLM coding
  21. Design of Godrej Single speed Transmission
  22. Investigation of Residual Stresses and Distortion in Fillet Welding
  23. Improvement of Initial Quality Standard (IQS) for Heating, Ventilation and Air-Conditioning (HVAC) of Vehicle
  24. Redefining the supply chain of health care products
  25. cost reduction of materials for FPH2 packaging machine using inventory management technique
  26. Designing of mechanisms for the self assembly of Two-Wheeled Robotic Systems.
  27. Feasibility Study of Parts Used in Textile Machinery Manufacturing
  28. Inventory management of machine spare parts and upgradation of machines
  29. Exploration of Shop Floor related problems
  30. Productivity Improvement in Encapsulation Machine Assembly Line using Inventory Management Technique
  31. EAM Transit' Application on TAB-ANDROID Version Implementation
  32. Quality Analysis of Tube to Tubesheet joint for Heat Exchangers
  33. Quality assurance of galvanised and galvalume sheet
  34. Productivity improvement by automation in cold rolling department
  35. To Achieve Zero Breakdown on Kolb Deep Hole Drilling Machine

Project evaluation process


Table for assessment methods

Assessment Method Course Outcome
CO1 CO2 CO3 CO4 CO5
Stage 1 Presentation S1 30% 10% - 20% 10%
Stage 2  Presentation S2 10% 20% 30% 20% 30%
Evaluation by Internal Guide I 30% 30% 30% 30% 40%
Report Preparation R 20% 30% 30% 20% 10%
Course exit survey  C 10% 10% 10% 10% 10%

 

Rubrics:


Stage 1 Presentation

Sap ID Student Name Familiarity with organisational setup, Department and job functions. Exposure to technology, applications and practical approaches Clarity about the assigned project and problem resolving approach Effectiveness of Presentation
    15 10 10 15

 

Stage 2 Presentation

Sap ID Student Name Problem formulation and approach methodology Problem specific application techniques  Quantum of project accomplished and outcomes and Personal contribution Effectiveness of Presentation
    5 10 20 15

 

Evaluation by Internal Guide

Sap ID Student Name Familiarity with organisational and Department and job functions and responsibilities as a trainee. Extend of grasping industrial practice and ability to resolve technical issues Extend of initiatives and personnel inputs reviewed. Input based on Company Officials Professionalism acquired
    5 20 15 5 5

 

Report Preparation

Sap Id Student Name Content and their organisation Writing Mechanics Depth of authentic technical contents and displays Figures/ Tables Abstract, inferences/ conductions of the project.
    10 10 35 20 25

 

The List Of Projects Undertaken By B.E. Students (2016-17)

  1. Electromagnetic Face Drive for OD Cylindrical Grinding of Gearbox Pins
  2. Standardization of assembly line using Single Piece Flow and development of self-tapping screw on PCB board.
  3. Design of Plastic products & implementation of transportation model.
  4. Intricacies of Deep Hole Drilling & Trouble Shooting.
  5. Design of fixtures for analog meter assembly line.
  6. Dummy Fixture for fin stabiliser system.
  7. Design of Fixture for Time Reduction in Inspection of Flange Forgings.
  8. Design of Fixtures to improve assembly line productivity for process equipments
  9. Heat Exchanger Process Revision
  10. Fixture development for paint shop and Assembly line optimization.
  11. Trouble shooting of ITTL Loading Trolley through Root Cause Analysis.
  12. Welding Cost Analysis through Value Engineering
  13. Design of fixture for time reduction in Nozzle Setup of a pressure vessel Improvement in stopper mechanism for rotator frame of a shell assembly setup
  14. Comparision & Improvisation of hydrostatic expansion used in Tube to Tube Sheet Fixing.
  15. Developement of jig and fixture for drill cycle time reduction.
  16. Optimizing productivity of motorised beds
  17. Reduction in cycle time of hobbing process and improvising technical skills of the work force through training modules.
  18. Variability Reduction at End of Line Testing of Mahindra's KUV100 Transaxle
  19. Improvement in material handling system and packaging to minimize rejections and cost of piston.
  20. Cycle Time Reduction in Fabrication of PSLV motor casing.
  21. Productivity improvement of TATA Xenon model's axle variants through logistics planning and shop layout redesign
  22. Development of new Interio furniture product for work from home project.
  23. Man Hour Optimization & Full Kit Readiness
  24. Productivity improvement in crankshaft material handling systems and implementation of underground burr management system in CNCs
  25. Improving productivity and Supply Chain Efficiency through Lead time Management of Godrej products
  26. Implementation of 5S in Yarn Storage Department
  27. Improvements in Fabrication and Inspection methods of heat exchangers and pressure vessels
  28. Process improvement and reduction of cycle time for big safe, safe deposit and 3ks petroleum lock.
  29. Redesign of material handling and chip disposal mechanism for Edge Master Milling Machine
  30. PRODUCTIVITY ENHANCEMENT THROUGH DIGITIZATION
  31. Development of Single Piece Flow system of Assembly line and Productivity Improvement using Jig and Fixtures.
  32. Productivity Improvement using Simulation Tool (Arena Simulation)
  33. Sourcing decision by capacity mapping of vendors.
  34. Supply Chain Evaluation of SADM
  35. Improvement in Quality inspection of assembly process of Pharma Gel Machine and designing of Inspection gauge.
  36. Finalizing Inventory norms for Healthcare products by using Forecasting techniques.
  37. Breakdown call log system
  38. Exploring the Quality Aspect of Defender Safes.
  39. Strengthening the supply chain of the department by understanding supplier needs and formulating an action plan.
  40. Improvement in Drop Test Procedure for all chair types and furniture variety.

Project evaluation process


Table for assessment methods

Assessment Method Course Outcome
CO1 CO2 CO3 CO4 CO5
Stage 1 Presentation S1 30% 10% - 20% 10%
Stage 2  Presentation S2 10% 20% 30% 20% 30%
Evaluation by Internal Guide I 30% 30% 30% 30% 40%
Report Preparation R 20% 30% 30% 20% 10%
Course exit survey  C 10% 10% 10% 10% 10%

 

Rubrics:


Stage 1 Presentation

Sap ID Student Name Familiarity with organisational setup, Department and job functions. Exposure to technology, applications and practical approaches Clarity about the assigned project and problem resolving approach Effectiveness of Presentation
    15 10 10 15

 

Stage 2 Presentation

Sap ID Student Name Problem formulation and approach methodology Problem specific application techniques  Quantum of project accomplished and outcomes and Personal contribution Effectiveness of Presentation
    5 10 20 15

 

Evaluation by Internal Guide

Sap ID Student Name Familiarity with organisational and Department and job functions and responsibilities as a trainee. Extend of grasping industrial practice and ability to resolve technical issues Extend of initiatives and personnel inputs reviewed. Input based on Company Officials Professionalism acquired
    5 20 15 5 5

 

Report Preparation

Sap Id Student Name Content and their organisation Writing Mechanics Depth of authentic technical contents and displays Figures/ Tables Abstract, inferences/ conductions of the project.
    10 10 35 20 25

 

The List Of Projects Undertaken By B.E. Students (2015-16)

  1. Truss structure extension and process optimizations for new car variant
  2. Process optimization and fool-proofing to accommodate parts and processes of a new car variant
  3. Rudder Fabrication
  4. Tongue and groove ring storage rack fabrication
  5. Intricacies in Fabrication with Titanium
  6. Green Supply chain management in logistics
  7. Implementation of 5S in Inventory Control
  8. Material management through vendor development and evaluation & design improvements in capsule guide and slide valve.
  9. Material Handling Equipment
  10. Vendor Rationalization-Increasing cost efficiency and reducting lead time & improvements in tablet compression machine
  11. Design Modification of Interchangeable Jig
  12. Productivity improvement and development of fire resisting safes
  13. Fixture Design of PQR plates storage for ease of material handling
  14. Value Engineering and Development of Padlocks
  15. Process Improvement In Safe Assembly Line
  16. Reduction in Defects of Safe Deposit & Vertibolt Cartridge using QM Methodology
  17. Design Modification of Fixtures for Screw Plug Heat Exchangers
  18. Design of assembly and inspection fixture for capsule manufacturing and printing machine
  19. Productivity and Safety Improvement on Safe Assembly Line
  20. Measurement system analysis
  21. Initialization and Maintenance of PTFE plant
  22. Lead time reduction and Design Improvements using Lean Manufacturing methods
  23. Understanding Product Structure
  24. Product improvement for Eliminating warranty complaints of 7lever round pad lock and Removal of in process rework of Brass Pad Lock
  25. Process Improvement of Multipurpose Furniture Bolt for enhanced quality
  26. Kaizen in locking solutions and systems division of godrej
  27. Implementation of first pillar of TPM, JH-step5
  28. Design and Fabrication of Cages for Portable Ovens, Flux Holding Attachment in SAW Welding & Inventory Control of DPT Materials
  29. Design Enhancement of Key Bitting Fixture
  30. Prototyping of Electronically Controlled Powerpack for Defense Tracked Vehicle

 

The List Of Projects Undertaken By B.E. Students (2014-15)

  1. Pressure Vessel fabrication aspects and design.
  2. Development of Tools.
  3. Replacement of cellulose material for scrapes and lead time reduction by designing template for base plate in Tablet compressing Machine.
  4. Modification of frame welding fixture.
  5. Cost reduction in manufacturing of Hatch Ring and foundation plate for UVLM.
  6. Quality aspects of tube to tubesheet welding and weld time optimisation.
  7. Raw material inventory cost reduction using dynamic buffer management system
  8. Implementation of total productive maintenance pillar (Preventive Maintenance) in maintenance department.
  9. Design of (1) New press tool for Bending C-Handle (2) Painting fixture for C-Handle and actuating plate.
  10. A) Streamlining Project Management Tracking System for OEM Projects. B) Time study of Muffler end Spining Machine.
  11. A) Bill of material validation. B) Preparation of Route sheet for various jobs.
  12. Reduction in Reshoot Spots in Radiography Testing of Tube to Tube Sheet Joints by Improving Location System.
  13. In-house product development.
  14. A) Failure Mode Identification and Preparation of Quality Assurance Matrix for 1.2L NGNA Engine. B)Identification of Leakage for 273 MPFI Engine.
  15. Implementation of theory of constraints for productivity improvement
  16. A) Vehicle Tracking system using RFID Technology B) Extension of Light Canopy for quality check. C) Management of inventory levels of Rework parts by Set Up of Logistic Warehouse.
  17. A) Implementation of T.P.M. pillar-preventive maintenance. B) Line Balancing of Lock assembly.
  18. Inspection and Quality enhancement of submerge arc welding process and inventory control DPT Material
  19. Productivity Improvement by Manpower and Wastage reduction.
  20. Performance enhacement of Fuel Fired Furnace.
  21. Design of Fixture to improve productivity in handling of shroud shell assembly.
  22. Lean Practices to Improve Productivity in IVCB
  23. Design of wiremesh punching table and turn table fixture.
  24. Refractory design and Procurement for waste heat Boiler.
  25. Inventory Optimisation through lead time reduction at vendor end.
  26. Cost Reduction through Quality Improvement and Supply Chain Management.
  27. TPM Stabilisation and Process Improvement
  28. Rejection Control and Lead time reduction in Encapsulation and HCM Division.
  29. Plant space utilization, Devendorising of upholstory and RFID in Interiao Department.
  30. Inmplementation of first Pillar of TPM, Jishu Hozen-Step-5
  31. Reduction in time requirement in Baffle Assembly and Ultrasonic Thickness Meter Calibration
  32. Cost and Lead time reduction of spares in Interio department.
  33. Optimisation of Production Line through Valve Stream Mapping for Safe Deposit Plate and 3KS Petroleum Body
  34. Productivity Improvements in Machining of Middle Segment of Polar Satellite Launching Vehicle.
  35. Productivity Improvement by Reducing Lead Time in Assembly of Machine Tablet compresing machine.
  36. New product introduction, lead time reduction and quality improvement of spares in interio department.

 

The List Of Projects Undertaken By B.E. Students (2013-14)

  1. Product improvement through innovative design.
  2. Prouctivity Improvement in Switchgear assembly line.
  3. Development and modification of moulded case circuit breakers.
  4. E-Solutions for SLDC- a. Minimizing Response time with the customer. b. Selection of components. c. Weight omputation.
  5. Improvement of censafe Assembly line.
  6. Increase in productivity of Inner Body Cell Unit.
  7. Analysis & improvement of Record Protecting Equipment Manufacturing.
  8. Cost optimization of plastics and copper parts of air circcuit breaker.
  9. Implementation of Six Sigma ans Product development of LED well glass & Glass ring.
  10. Lead time reduction through value stream mapping of AF90T machine.
  11. Productivity improvement of AF90T machine assembly line.
  12. Standardization of AC Air Compressors (1- 1.5 T).
  13. Optimization of Chassis Assembly line and quality evaluation.
  14. Process improvements & Kaizen implementation in press shop.
  15. Root cause analysis for ovality in wind tunnel nozzle sections.
  16. Introduction of TPM culture in securities solutions division.
  17. TPM Stabilization & Process Improvement.
  18. Design of painting fixture and material handling trolley for traction motor assembly shop.
  19. Development and testing of thermo-magnetic release.
  20. Design and development of rotor assembly of switch disconnectors.
  21. Improvement in shot blasting process through modified screw conveyor design.
  22. Cost reduction of 2L mortise lock & good padlock designing.
  23. Geometric modelling and analysis of methanol wash column using pv-elite software.
  24. Process improvement of robotic stud welding.
  25. Eradicating Oil leakage through exhaust manifold of two cylinder engines.
  26. Welding Optimization & resource management.
  27. Project Planning & expediting of gasifier reactor.
  28. Inventory Control & planning of electrical system equipments (ESE) & Modification of packaging standards for ESE.
  29. Inventory management of drilling and turning inserts & Enhancing overall equipment efficiency of vertical lathe machine
  30. Time study and analysis of SPF line
  31. Efficiency Enhancement of hardware procurement & streamlining of plating details.
  32. Cost & Time Reduction using CPM-PERT for base welded feet
  33. Trouble shooting and parametric optimization of tube to tube sheet welding.
  34. Manufacturing sequencing and fabrication cycle time estimation of residence vessel.
  35. Enhancing orbital tube welding efficiency in heat exchangers & Development of inventory layout for electro welding strips.
  36. Exploring implementation of hot wire TIG welding for better results & Development of ESSC fixture to overcome the use of FCAW.
  37. Cost reduction of balancing ring & manufacturing feasibility of shaft by upset forging.
  38. Optimization of assembly line of 35B5 product and material management using ERP system.

 

The List Of Projects Undertaken By B.E. Students (2012-13)

  1. Fabrication and Chemical Cleaning of Sodium-Air Heat Exchanger.
  2. Development of LCA Machine.
  3. Development of Special Purpose Machine.
  4. Defects, Troubleshooting & Quality Improvement of Safes. Time Study of Safe Assembly Workstations.
  5. Design Aspects of Hydrotest Saddle Supports. Design Aspects of Long seam welding Fixture.
  6. Value Stream Mapping. Defect Analysis. Overall Equipment Effectiveness.
  7. Total Productive Maintenance and Heat distortion Control.
  8. Standardization of Air Compressors.
  9. Value Engineering of Circuit Breaker Packaging.
  10. Lead Time Reduction & Zero based costing analysis.
  11. Value stream Mapping of Astro Lock.
  12. Value Engineering of contact in circuit breaker.
  13. Elimination of black soot emission from low-velocity gas burners.
  14. Process Improvement on RPE line.
  15. Re- Engineering of Ultra Mortise & Disc Padlock.
  16. Value stream mapping.
  17. Work breakdown structure for LP feedwater heater & design of fixture for DSS shells.
  18. Improvement in the moulded case circuit breakers.
  19. Manufacturing planning of external riser. Alternate lifting method for replacement of STLX.
  20. Supply Chain management of primary tar separator.
  21. Development in circuit breakers.
  22. Fixture design and modifications in die.
  23. Strategic Product Improvement.