The List Of Projects Undertaken By B.E. Students (2018-19)
- Design of sliders for plastic injection moulds and feaseability study of additive manufacturing for tool rooms
- Advancements in 3D Printing technology, Material testing, Flame Resistant Materials
- Productivity Improvement of Interchangeable systems of AF machines by standardization of processes and Ergonomic designing of workstations
- Integration of 3D Printing in L&T's K9 Vajra & Planning and Execution of Joystick Assembly
- Reduction of Inventory Costs by Salvaging Free Stock and Implementation of 5S and Continuous Improvement
- Assembly line balancing
- Plant layout for Coating Shop & Intricacies in Phosphate coating
- Design of Test Rig for Hydraulic Naval Ship Stabiliser
- Fine Tuning of Planning Documents, Cost Reduction of Heat Exchangers
- Productivity Improvement through Design Improvements in Welding Positioner, Optimization of Preheating Methods for Welded Joints and Setting up Methodology of Tank Rotators
- Improvements in the procurement and storage of tooling materials for m/c shop and CNC department.
- Defect Analysis of HP Feed Water Heater using QC Tools & Implementation of Lean Manufacturing Techniques in the Insertion of Tube Bundle in Heat Exchangers
- Process development and Die designing for Sheet Metal components
- Lead time reduction in assembly of Encapsulation machines by introduction of Material replenishment systems
- EAM & LN Integration for spare part management and standardization of parts
- Implementation of QR code for tracking and improving material management on shop floor
- Reduction in cycle time of Nozzle Fabrication Process
- Standardization of Mould design and implementation of 5s
- Development of a Procedure to Check Tube to Tubesheet Joint Expansion and Automated Shell Marking System
- Cost Reduction Through Optimization of Calibration Interval
- Design of lifting assembly for submerged arc welding (SAW) machine
- Migration from OHSAS 18001 to ISO 45001
- Evaluation and optimization of welding of PSLV middle segments and design of inventory tracking system
- PROCESS PLANNING OF AUTOMATIC FILLING SERIES MACHINE FOR COST OPTIMIZATION
- Design of Plate Alignment Fixture for Rolling Machine
- Reduction in Stock Variance by using Material Management Techniques
- Assisting and Catalyzing the Communications and Marketing Process
- Tube to tubesheet orbital welding of Titanium
- Design of Cost Effective Semi-electric Hand Pallet Trolley
- Implementation of LEAN Six Sigma on shop floor
- Optimisation of the machining Parameters and implementation of 5S
- Design of fixture for stiffness test of helical torsion spring
- Increasing the efficiency of conveyorized powder coating system by fixture modification &
- Harnessing the light energy emitted by LED light fittings during soaking process by using solar panels
- Improvement in material feeding system by introducing kitting concept for assembly of AF90T machine
- Standardization of sliders and lifters in a mould and Implementation of 5s
- RE-DESIGNING AND DRAFTING OF NON-STANDARD TERMINAL BOX
- Improvement in Material Procurement and Stores Functioning
- Successful execution of drilling & machining of titanium tubesheets
- spare optimization and design of fixture for helical torsion spring
- Fixture for measuring boundary conditions of MCCB(Frame 6)
The List Of Projects Undertaken By B.E. Students (2017-18)
- Design, Planning and Manufacturing of Elbow Mounting Fixture & Proposal for Procurement of Inclined Band saw and Design of its Clamping Fixture for Backing Ring
- Implementation of Minimum Order Quantity to Reduce the Lead time in supply value chain
- Optimization Of Truck Trailer Chassis Using Static Structural Analysis
- Applying Manufacturing Excellence At Vendors
- Optimisation of transport cost and maximization of GST benefits
- Thrust shaft axial movement correction in Thrust Bearing Assembly
- A Comprehensive study of design methodology of pressure vessel using ASME BPVC DIV 1 vis a vis CODAP DIV 1
- Business Transformation of the Centralized Spares Department
- Cycle Time Reduction of spot welding in 32PHB Basket
- Implementation of design for manufacturing for critical structural components employed in two wheeled robotic system
- Development of post processor for optimizing CNC machining processes and design of machining fixture of sub-antenna for SAC (ISRO)
- Streamlining supply chain for Linea with GST Migration
- Intricacies in Tube-to-Tubesheet welding
- Developing Tailor Made Solution for Improvising Scintilla Chair, Vendor Development for An Alternate Source for RM Nylon 6 & Supplier Evaluation Using BS Rating
- Development & Indigenisation of Running Gear for Military Vehicle
- Enhancement of Productivity for Karina Chair Upholstery using Vacuum Foam Moulding
- Creating logistics module
- Intricacies in heat treatment of steam drum
- Design of Process Planning for Enhancement of Efficiency in Assembly of Capsule Filling and Band Sealing Machines
- Inventory of standard parts with attributes acquisition and PLM coding
- Design of Godrej Single speed Transmission
- Investigation of Residual Stresses and Distortion in Fillet Welding
- Improvement of Initial Quality Standard (IQS) for Heating, Ventilation and Air-Conditioning (HVAC) of Vehicle
- Redefining the supply chain of health care products
- cost reduction of materials for FPH2 packaging machine using inventory management technique
- Designing of mechanisms for the self assembly of Two-Wheeled Robotic Systems.
- Feasibility Study of Parts Used in Textile Machinery Manufacturing
- Inventory management of machine spare parts and upgradation of machines
- Exploration of Shop Floor related problems
- Productivity Improvement in Encapsulation Machine Assembly Line using Inventory Management Technique
- EAM Transit' Application on TAB-ANDROID Version Implementation
- Quality Analysis of Tube to Tubesheet joint for Heat Exchangers
- Quality assurance of galvanised and galvalume sheet
- Productivity improvement by automation in cold rolling department
- To Achieve Zero Breakdown on Kolb Deep Hole Drilling Machine
Project evaluation process
Table for assessment methods
Assessment Method |
Course Outcome |
CO1 |
CO2 |
CO3 |
CO4 |
CO5 |
Stage 1 Presentation |
S1 |
30% |
10% |
- |
20% |
10% |
Stage 2 Presentation |
S2 |
10% |
20% |
30% |
20% |
30% |
Evaluation by Internal Guide |
I |
30% |
30% |
30% |
30% |
40% |
Report Preparation |
R |
20% |
30% |
30% |
20% |
10% |
Course exit survey |
C |
10% |
10% |
10% |
10% |
10% |
Rubrics:
Stage 1 Presentation
Sap ID |
Student Name |
Familiarity with organisational setup, Department and job functions. |
Exposure to technology, applications and practical approaches |
Clarity about the assigned project and problem resolving approach |
Effectiveness of Presentation |
|
|
15 |
10 |
10 |
15 |
Stage 2 Presentation
Sap ID |
Student Name |
Problem formulation and approach methodology |
Problem specific application techniques |
Quantum of project accomplished and outcomes and Personal contribution |
Effectiveness of Presentation |
|
|
5 |
10 |
20 |
15 |
Evaluation by Internal Guide
Sap ID |
Student Name |
Familiarity with organisational and Department and job functions and responsibilities as a trainee. |
Extend of grasping industrial practice and ability to resolve technical issues |
Extend of initiatives and personnel inputs reviewed. |
Input based on Company Officials |
Professionalism acquired |
|
|
5 |
20 |
15 |
5 |
5 |
Report Preparation
Sap Id |
Student Name |
Content and their organisation |
Writing Mechanics |
Depth of authentic technical contents and displays |
Figures/ Tables |
Abstract, inferences/ conductions of the project. |
|
|
10 |
10 |
35 |
20 |
25 |
The List Of Projects Undertaken By B.E. Students (2016-17)
- Electromagnetic Face Drive for OD Cylindrical Grinding of Gearbox Pins
- Standardization of assembly line using Single Piece Flow and development of self-tapping screw on PCB board.
- Design of Plastic products & implementation of transportation model.
- Intricacies of Deep Hole Drilling & Trouble Shooting.
- Design of fixtures for analog meter assembly line.
- Dummy Fixture for fin stabiliser system.
- Design of Fixture for Time Reduction in Inspection of Flange Forgings.
- Design of Fixtures to improve assembly line productivity for process equipments
- Heat Exchanger Process Revision
- Fixture development for paint shop and Assembly line optimization.
- Trouble shooting of ITTL Loading Trolley through Root Cause Analysis.
- Welding Cost Analysis through Value Engineering
- Design of fixture for time reduction in Nozzle Setup of a pressure vessel Improvement in stopper mechanism for rotator frame of a shell assembly setup
- Comparision & Improvisation of hydrostatic expansion used in Tube to Tube Sheet Fixing.
- Developement of jig and fixture for drill cycle time reduction.
- Optimizing productivity of motorised beds
- Reduction in cycle time of hobbing process and improvising technical skills of the work force through training modules.
- Variability Reduction at End of Line Testing of Mahindra's KUV100 Transaxle
- Improvement in material handling system and packaging to minimize rejections and cost of piston.
- Cycle Time Reduction in Fabrication of PSLV motor casing.
- Productivity improvement of TATA Xenon model's axle variants through logistics planning and shop layout redesign
- Development of new Interio furniture product for work from home project.
- Man Hour Optimization & Full Kit Readiness
- Productivity improvement in crankshaft material handling systems and implementation of underground burr management system in CNCs
- Improving productivity and Supply Chain Efficiency through Lead time Management of Godrej products
- Implementation of 5S in Yarn Storage Department
- Improvements in Fabrication and Inspection methods of heat exchangers and pressure vessels
- Process improvement and reduction of cycle time for big safe, safe deposit and 3ks petroleum lock.
- Redesign of material handling and chip disposal mechanism for Edge Master Milling Machine
- PRODUCTIVITY ENHANCEMENT THROUGH DIGITIZATION
- Development of Single Piece Flow system of Assembly line and Productivity Improvement using Jig and Fixtures.
- Productivity Improvement using Simulation Tool (Arena Simulation)
- Sourcing decision by capacity mapping of vendors.
- Supply Chain Evaluation of SADM
- Improvement in Quality inspection of assembly process of Pharma Gel Machine and designing of Inspection gauge.
- Finalizing Inventory norms for Healthcare products by using Forecasting techniques.
- Breakdown call log system
- Exploring the Quality Aspect of Defender Safes.
- Strengthening the supply chain of the department by understanding supplier needs and formulating an action plan.
- Improvement in Drop Test Procedure for all chair types and furniture variety.
Project evaluation process
Table for assessment methods
Assessment Method |
Course Outcome |
CO1 |
CO2 |
CO3 |
CO4 |
CO5 |
Stage 1 Presentation |
S1 |
30% |
10% |
- |
20% |
10% |
Stage 2 Presentation |
S2 |
10% |
20% |
30% |
20% |
30% |
Evaluation by Internal Guide |
I |
30% |
30% |
30% |
30% |
40% |
Report Preparation |
R |
20% |
30% |
30% |
20% |
10% |
Course exit survey |
C |
10% |
10% |
10% |
10% |
10% |
Rubrics:
Stage 1 Presentation
Sap ID |
Student Name |
Familiarity with organisational setup, Department and job functions. |
Exposure to technology, applications and practical approaches |
Clarity about the assigned project and problem resolving approach |
Effectiveness of Presentation |
|
|
15 |
10 |
10 |
15 |
Stage 2 Presentation
Sap ID |
Student Name |
Problem formulation and approach methodology |
Problem specific application techniques |
Quantum of project accomplished and outcomes and Personal contribution |
Effectiveness of Presentation |
|
|
5 |
10 |
20 |
15 |
Evaluation by Internal Guide
Sap ID |
Student Name |
Familiarity with organisational and Department and job functions and responsibilities as a trainee. |
Extend of grasping industrial practice and ability to resolve technical issues |
Extend of initiatives and personnel inputs reviewed. |
Input based on Company Officials |
Professionalism acquired |
|
|
5 |
20 |
15 |
5 |
5 |
Report Preparation
Sap Id |
Student Name |
Content and their organisation |
Writing Mechanics |
Depth of authentic technical contents and displays |
Figures/ Tables |
Abstract, inferences/ conductions of the project. |
|
|
10 |
10 |
35 |
20 |
25 |
The List Of Projects Undertaken By B.E. Students (2015-16)
- Truss structure extension and process optimizations for new car variant
- Process optimization and fool-proofing to accommodate parts and processes of a new car variant
- Rudder Fabrication
- Tongue and groove ring storage rack fabrication
- Intricacies in Fabrication with Titanium
- Green Supply chain management in logistics
- Implementation of 5S in Inventory Control
- Material management through vendor development and evaluation & design improvements in capsule guide and slide valve.
- Material Handling Equipment
- Vendor Rationalization-Increasing cost efficiency and reducting lead time & improvements in tablet compression machine
- Design Modification of Interchangeable Jig
- Productivity improvement and development of fire resisting safes
- Fixture Design of PQR plates storage for ease of material handling
- Value Engineering and Development of Padlocks
- Process Improvement In Safe Assembly Line
- Reduction in Defects of Safe Deposit & Vertibolt Cartridge using QM Methodology
- Design Modification of Fixtures for Screw Plug Heat Exchangers
- Design of assembly and inspection fixture for capsule manufacturing and printing machine
- Productivity and Safety Improvement on Safe Assembly Line
- Measurement system analysis
- Initialization and Maintenance of PTFE plant
- Lead time reduction and Design Improvements using Lean Manufacturing methods
- Understanding Product Structure
- Product improvement for Eliminating warranty complaints of 7lever round pad lock and Removal of in process rework of Brass Pad Lock
- Process Improvement of Multipurpose Furniture Bolt for enhanced quality
- Kaizen in locking solutions and systems division of godrej
- Implementation of first pillar of TPM, JH-step5
- Design and Fabrication of Cages for Portable Ovens, Flux Holding Attachment in SAW Welding & Inventory Control of DPT Materials
- Design Enhancement of Key Bitting Fixture
- Prototyping of Electronically Controlled Powerpack for Defense Tracked Vehicle
The List Of Projects Undertaken By B.E. Students (2014-15)
- Pressure Vessel fabrication aspects and design.
- Development of Tools.
- Replacement of cellulose material for scrapes and lead time reduction by designing template for base plate in Tablet compressing Machine.
- Modification of frame welding fixture.
- Cost reduction in manufacturing of Hatch Ring and foundation plate for UVLM.
- Quality aspects of tube to tubesheet welding and weld time optimisation.
- Raw material inventory cost reduction using dynamic buffer management system
- Implementation of total productive maintenance pillar (Preventive Maintenance) in maintenance department.
- Design of (1) New press tool for Bending C-Handle (2) Painting fixture for C-Handle and actuating plate.
- A) Streamlining Project Management Tracking System for OEM Projects. B) Time study of Muffler end Spining Machine.
- A) Bill of material validation. B) Preparation of Route sheet for various jobs.
- Reduction in Reshoot Spots in Radiography Testing of Tube to Tube Sheet Joints by Improving Location System.
- In-house product development.
- A) Failure Mode Identification and Preparation of Quality Assurance Matrix for 1.2L NGNA Engine. B)Identification of Leakage for 273 MPFI Engine.
- Implementation of theory of constraints for productivity improvement
- A) Vehicle Tracking system using RFID Technology B) Extension of Light Canopy for quality check. C) Management of inventory levels of Rework parts by Set Up of Logistic Warehouse.
- A) Implementation of T.P.M. pillar-preventive maintenance. B) Line Balancing of Lock assembly.
- Inspection and Quality enhancement of submerge arc welding process and inventory control DPT Material
- Productivity Improvement by Manpower and Wastage reduction.
- Performance enhacement of Fuel Fired Furnace.
- Design of Fixture to improve productivity in handling of shroud shell assembly.
- Lean Practices to Improve Productivity in IVCB
- Design of wiremesh punching table and turn table fixture.
- Refractory design and Procurement for waste heat Boiler.
- Inventory Optimisation through lead time reduction at vendor end.
- Cost Reduction through Quality Improvement and Supply Chain Management.
- TPM Stabilisation and Process Improvement
- Rejection Control and Lead time reduction in Encapsulation and HCM Division.
- Plant space utilization, Devendorising of upholstory and RFID in Interiao Department.
- Inmplementation of first Pillar of TPM, Jishu Hozen-Step-5
- Reduction in time requirement in Baffle Assembly and Ultrasonic Thickness Meter Calibration
- Cost and Lead time reduction of spares in Interio department.
- Optimisation of Production Line through Valve Stream Mapping for Safe Deposit Plate and 3KS Petroleum Body
- Productivity Improvements in Machining of Middle Segment of Polar Satellite Launching Vehicle.
- Productivity Improvement by Reducing Lead Time in Assembly of Machine Tablet compresing machine.
- New product introduction, lead time reduction and quality improvement of spares in interio department.
The List Of Projects Undertaken By B.E. Students (2013-14)
- Product improvement through innovative design.
- Prouctivity Improvement in Switchgear assembly line.
- Development and modification of moulded case circuit breakers.
- E-Solutions for SLDC- a. Minimizing Response time with the customer. b. Selection of components. c. Weight omputation.
- Improvement of censafe Assembly line.
- Increase in productivity of Inner Body Cell Unit.
- Analysis & improvement of Record Protecting Equipment Manufacturing.
- Cost optimization of plastics and copper parts of air circcuit breaker.
- Implementation of Six Sigma ans Product development of LED well glass & Glass ring.
- Lead time reduction through value stream mapping of AF90T machine.
- Productivity improvement of AF90T machine assembly line.
- Standardization of AC Air Compressors (1- 1.5 T).
- Optimization of Chassis Assembly line and quality evaluation.
- Process improvements & Kaizen implementation in press shop.
- Root cause analysis for ovality in wind tunnel nozzle sections.
- Introduction of TPM culture in securities solutions division.
- TPM Stabilization & Process Improvement.
- Design of painting fixture and material handling trolley for traction motor assembly shop.
- Development and testing of thermo-magnetic release.
- Design and development of rotor assembly of switch disconnectors.
- Improvement in shot blasting process through modified screw conveyor design.
- Cost reduction of 2L mortise lock & good padlock designing.
- Geometric modelling and analysis of methanol wash column using pv-elite software.
- Process improvement of robotic stud welding.
- Eradicating Oil leakage through exhaust manifold of two cylinder engines.
- Welding Optimization & resource management.
- Project Planning & expediting of gasifier reactor.
- Inventory Control & planning of electrical system equipments (ESE) & Modification of packaging standards for ESE.
- Inventory management of drilling and turning inserts & Enhancing overall equipment efficiency of vertical lathe machine
- Time study and analysis of SPF line
- Efficiency Enhancement of hardware procurement & streamlining of plating details.
- Cost & Time Reduction using CPM-PERT for base welded feet
- Trouble shooting and parametric optimization of tube to tube sheet welding.
- Manufacturing sequencing and fabrication cycle time estimation of residence vessel.
- Enhancing orbital tube welding efficiency in heat exchangers & Development of inventory layout for electro welding strips.
- Exploring implementation of hot wire TIG welding for better results & Development of ESSC fixture to overcome the use of FCAW.
- Cost reduction of balancing ring & manufacturing feasibility of shaft by upset forging.
- Optimization of assembly line of 35B5 product and material management using ERP system.
The List Of Projects Undertaken By B.E. Students (2012-13)
- Fabrication and Chemical Cleaning of Sodium-Air Heat Exchanger.
- Development of LCA Machine.
- Development of Special Purpose Machine.
- Defects, Troubleshooting & Quality Improvement of Safes. Time Study of Safe Assembly Workstations.
- Design Aspects of Hydrotest Saddle Supports. Design Aspects of Long seam welding Fixture.
- Value Stream Mapping. Defect Analysis. Overall Equipment Effectiveness.
- Total Productive Maintenance and Heat distortion Control.
- Standardization of Air Compressors.
- Value Engineering of Circuit Breaker Packaging.
- Lead Time Reduction & Zero based costing analysis.
- Value stream Mapping of Astro Lock.
- Value Engineering of contact in circuit breaker.
- Elimination of black soot emission from low-velocity gas burners.
- Process Improvement on RPE line.
- Re- Engineering of Ultra Mortise & Disc Padlock.
- Value stream mapping.
- Work breakdown structure for LP feedwater heater & design of fixture for DSS shells.
- Improvement in the moulded case circuit breakers.
- Manufacturing planning of external riser. Alternate lifting method for replacement of STLX.
- Supply Chain management of primary tar separator.
- Development in circuit breakers.
- Fixture design and modifications in die.
- Strategic Product Improvement.